(2)
Each company has its own rating, which is based on points assigned by other companies based on the results of cooperation.
You can get acquainted with the criteria by clicking on the “Ranking Details” button:
Duration of the project:
3+ months – 2
6+ months – 3
12+ months – 4
2+ years – 5
Dev's English level:
Pre-Intermediate – 2
Intermediate – 3
Upper-Intermediate – 4
Advanced – 5
Clients Feedback:
1-10
The line Rating: 0/10 contains the arithmetic mean of all points.
The following reasons for closing a request are posted on the platform:
Won. The request was closed due to the winning.
Lost. Not a fit. The request was lost as the contractor could not realize the customer's idea during the communication.
Lost. Due to legal/security issues. The request was lost because the customer and the contractor disagreed on security and legal matters.
Lost. Price. The request was lost because the contractor needed to be cheaper for the client.
Lost. Client hired onsite. The request was lost because the client hired performers for the project for his offline team.
Lost. The client went with another team. The request was lost because the client hired another company to implement the project.
Lost. No response. The request was lost because the client stopped responding.
Lost. Due to the candidate's hard skills. The request was lost because all the candidates proposed to the client did not show the required technical level.
Lost. Due to the candidate's soft skills. The request was lost because none of the candidates proposed to the client matched the required cultural fit.
Lost. Overqualified. Because all the candidates proposed to the client were very highly technical.
Lost. English skills. The request was lost because the candidates had a low level of English.
Lost. Due to the test task failure. The request was lost because all the candidates offered to the client incorrectly completed the test task.
Lost. Due to location. The request was lost or not considered because the client did not consider candidates from the offered locations.
Lost. Due to political reasons. The request was lost because the client and the contractor have different political views that hinder practical cooperation.
Lost. Irrelevant experience in the position. The request was lost because all the candidates proposed to the client did not have the relevant skills to fulfill the request.
Lost. The format of cooperation needs to be more appropriate. The request was lost due to an inappropriate cooperation format.
Lost. The candidate accepts another offer. The request was lost because the candidate chosen by the client accepted another offer.
Lost. The candidate stopped considering the propositions. The request was lost because the candidate chosen by the client stopped considering the proposals.